TORONTO - Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM)('Eloro' or the 'Company') is pleased to announce that its Bolivian subsidiary Minera Tupiza S.R.L. has commenced the planned 3,500m underground diamond drilling program at Huayra Kasa on its optioned Iska Iska Polymetallic Project in Potosi Department, southern Bolivia.
The Company and contractor Empresa Minera Villegas S.R.L. have implemented safeguards to protect personnel from COVID-19. Drilling, which will be HQ-sized core, is being carried out by Leduc Drilling S.R.L. an experienced Bolivian drill contractor.
All underground workings are being systematically geologically mapped and channel sampled; to date this work is approximately one half completed. In addition, a surface trenching program is being carried out along with geological mapping and sampling to test the on-strike extension of the Huayra Kasa zone. Assay results for this work are pending. Preliminary geological work indicates that the Huayra Kasa zone extends at least 1 km along strike within the more extensive Iska Iska mineralized system. Silver-polymetallic mineralization within the Iska Iska system occurs over a potential strike length of more than 2.5km along major ring structures in a caldera complex.
Tom Larsen, President & CEO of Eloro commented: 'This program will be the first drilling to ever be carried out on the property and is designed to test the full extent of the mineralized system in and around the Huayra Kasa underground workings. The mineralized/altered zone is exposed in the underground workings over a width of 100m but is likely much more extensive. Drilling will initially test a strike length of approximately 300m to a depth of 100m in the vicinity of the mine workings, however the potential strike length of the Huayra Kasa zone is at least 1 km. Iska Iska is situated in the highly prolific Southern Bolivian Silver belt and has excellent potential to host a significant silver-polymetallic mineral deposit'.
About Iska Iska
Iska Iska polymetallic project is a road accessible, royalty-free property, wholly-controlled by the Title Holder, Empresa Minera Villegas S.R.L. and is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi. The property can be classified as a polymetallic (Ag, Zn, Pb, Au, Cu, Bi, Sn, In) epithermal-porphyry complex. This is an important mineral deposit type in Bolivia. Eloro's Bolivian subsidiary, Minera Tupiza S.R.L., has an option to acquire a 99% interest in Iska Iska.
Geological mapping on the property by Eloro has revealed the spatial and temporal zonation of alteration and vein minerals in an area of about 5 square kilometres. The polymetallic mineralization occurs mainly as veins, subsidiary vein swarms, veinlets, stockworks, and disseminations, forming a subvertical vein system in both the stock and the volcanic and sedimentary rocks. Preliminary evaluation work including 42 channel samples in underground and on surface workings at Iska Iska returned significant results as summarized below. All of the channel samples included altered wall rock with widths ranging between 1.20 to 5.55 m, averaging 2.90 m.
About Eloro Resources Ltd.
Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. Eloro recently commissioned a NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited and is available on Eloro's website and under its filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of Barrick's Lagunas Norte Gold Mine and Pan American Silver's La Arena Gold Mine. La Victoria consists of eight mining concessions and eight mining claims encompassing approximately 89 square kilometres. La Victoria has good infrastructure with access to road, water and electricity and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level.
CAUTION REGARDING FORWARD-LOOKING INFORMATION
Information in this news release may contain forward-looking information. Statements containing forward looking information express, as at the date of this news release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company. There can be no assurance that statements of forward-looking information will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information.
Contact:
Thomas G. Larsen
Tel: (416) 868-9168
Fax: (416) 361-1333
Email: tlarsen@elororesources.com
Web: www.elororesources.com